As part of our website, we use cookies to provide you with the highest level of service, including services tailored to your individual needs. By continuing to use the website without changing your cookie settings, you agree to the placement of cookies on your device as described in our Privacy Policy. You can change your cookie settings in your web browser at any time. Acceptance of essential cookies is required for the proper functioning of the website. For more detailed information, please refer to our PRIVACY POLICY.
OPTIMA
Increasing the reliability and safety level of an SF6 gas-insulated switchgear (g3) with enhanced rated parameters by implementing an operational monitoring system and an innovative solution to minimize the effects of arc faults.
Project co-financed by the European Regional Development Fund under agreement POIR.04.01.04-00-0073/15
Title: “Increasing the Reliability and Safety Level of an SF6 Gas-Insulated Switchgear (g3) with Enhanced Rated Parameters by Implementing an Operational Monitoring System and an Innovative Solution to Minimize the Effects of Arc Faults.”
PROJECT OBJECTIVE:
The objective of the project is to develop and manufacture an SF6 gas-insulated switchgear (or alternatively g3 gas) with enhanced rated parameters, increased reliability, and operational safety. The reliability of the gas-insulated switchgear will be improved through the use of modern solutions, including a system for monitoring operational parameters.
PLANNED EFFECT:
optimization of insulation in SF6 (g3) gas-insulated switchgear, providing guidelines for its dimensioning,
minimization of the dimensions of switchgear compartments and entire switchgear units, which determine the size of the buildings where such switchgear will be installed,
enhancement of operational safety for these devices, with particular emphasis on potential hazards during internal arc fault conditions,
increased operational reliability and maintenance-free performance over long service intervals (reducing operational costs),
increased allowable current-carrying capacity under cooling conditions with SF6 or g3 insulating gas (in the equipment compartment) and with solid insulation (in the busbar compartment), ensuring cost reduction.
PROJECT VALUE: 7,307,875.84 PLN,
including funding of 5,226,569.26 PLN.
The consortium includes:
ELEKTROBUDOWA SA – Leader
Sieć Badawcza Łukasiewicz – Instytut Technik Innowacyjnych EMAG