{"id":24020,"date":"2025-06-06T07:42:12","date_gmt":"2025-06-06T05:42:12","guid":{"rendered":"https:\/\/ai.lukasiewicz.gov.pl\/projekty-krajowe\/wodowo\/"},"modified":"2026-03-23T12:41:30","modified_gmt":"2026-03-23T11:41:30","slug":"wodowo","status":"publish","type":"projekty-krajowe","link":"https:\/\/ai.lukasiewicz.gov.pl\/en\/projekty-krajowe\/wodowo\/","title":{"rendered":"WODOWO"},"content":{"rendered":"","protected":false},"featured_media":0,"template":"","categories":[280],"class_list":["post-24020","projekty-krajowe","type-projekty-krajowe","status-publish","hentry","category-ongoing"],"acf":{"data_od":"2021.10.01 - 2025.09.30","opis":"<p>The Closed-Loop Water System in a Hydrogen Energy Installation \u2013 WODOWO<\/p>\n<p>The project&#8217;s goal is to develop a water preparation system of the appropriate quality for powering the electrolyzer.<\/p>\n<p>To verify the water preparation system, the project plans to build a laboratory-scale hydrogen installation. The electrolyzer&#8217;s power will not exceed 1 kW, and the tank capacity will be approximately 50 liters. The system will be equipped with a hydrogen fuel cell and hydrogen sensors   <\/p>\n<p>Conducting a risk analysis for the planned hydrogen technological installation will help identify potential safety and health hazards, eliminate them in the future, and verify the installation in accordance with applicable safety standards.<\/p>\n<p>The project is being carried out in a consortium.<\/p>\n<ul>\n<li>Sie\u0107 Badawcza \u0141ukasiewicz \u2013 Instytut Technologii Eksploatacji \u2013 Lider<\/li>\n<li>\u0141ukasiewicz Research Network \u2013 Institute of Electrical Engineering<\/li>\n<li>Sie\u0107 Badawcza \u0141ukasiewicz \u2013 Instytut Metali Nie\u017celaznych<\/li>\n<li>\u0141ukasiewicz Research Network \u2013 Institute of Artificial Intelligence and Cybersecurity (\u0141ukasiewicz \u2013 AI)<\/li>\n<\/ul>\n<p>Type: <strong>Targeted Grant of the \u0141ukasiewicz Research Network<\/strong><\/p>\n<p>Funding (\u0141ukasiewicz \u2013 AI): <strong>PLN 95,125.00<\/strong><br \/>\nTotal value of the project (\u0141ukasiewicz \u2013 AI):<strong> PLN 95,125.00<\/strong><\/p>\n<p>Total cost of project implementation: <strong>PLN 2,113,475.00<\/strong>, including funding of PLN<strong> 2,113,475.00<\/strong><\/p>\n","skrocony_opis":"The Closed-Loop Water System in a Hydrogen Energy Installation \u2013 WODOWO","flagi_gora":{"ID":16148,"id":16148,"title":"WODOWO","filename":"WODOWO.webp","filesize":18538,"url":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO.webp","link":"https:\/\/ai.lukasiewicz.gov.pl\/en\/national-projects\/wodowo-2\/","alt":"flaga i god\u0142o z or\u0142em","author":"126","description":"","caption":"","name":"wodowo-2","status":"inherit","uploaded_to":19775,"date":"2024-02-15 09:13:12","modified":"2024-10-24 09:12:30","menu_order":0,"mime_type":"image\/webp","type":"image","subtype":"webp","icon":"https:\/\/ai.lukasiewicz.gov.pl\/wp-includes\/images\/media\/default.png","width":2480,"height":248,"sizes":{"thumbnail":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-150x150.webp","thumbnail-width":150,"thumbnail-height":150,"medium":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-300x30.webp","medium-width":300,"medium-height":30,"medium_large":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-768x77.webp","medium_large-width":580,"medium_large-height":58,"large":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-1024x102.webp","large-width":580,"large-height":58,"1536x1536":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-1536x154.webp","1536x1536-width":1536,"1536x1536-height":154,"2048x2048":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-2048x205.webp","2048x2048-width":2048,"2048x2048-height":205,"news-section-thumbnail":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-1000x248.webp","news-section-thumbnail-width":1000,"news-section-thumbnail-height":248,"post-thumbnail":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-1200x120.webp","post-thumbnail-width":1200,"post-thumbnail-height":120,"twentytwenty-fullscreen":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO-1980x198.webp","twentytwenty-fullscreen-width":1980,"twentytwenty-fullscreen-height":198,"menu-24x24":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO.webp","menu-24x24-width":24,"menu-24x24-height":2,"menu-36x36":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO.webp","menu-36x36-width":36,"menu-36x36-height":4,"menu-48x48":"https:\/\/ai.lukasiewicz.gov.pl\/wp-content\/uploads\/sites\/22\/2024\/02\/WODOWO.webp","menu-48x48-width":48,"menu-48x48-height":5}}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/ai.lukasiewicz.gov.pl\/en\/wp-json\/wp\/v2\/projekty-krajowe\/24020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ai.lukasiewicz.gov.pl\/en\/wp-json\/wp\/v2\/projekty-krajowe"}],"about":[{"href":"https:\/\/ai.lukasiewicz.gov.pl\/en\/wp-json\/wp\/v2\/types\/projekty-krajowe"}],"wp:attachment":[{"href":"https:\/\/ai.lukasiewicz.gov.pl\/en\/wp-json\/wp\/v2\/media?parent=24020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ai.lukasiewicz.gov.pl\/en\/wp-json\/wp\/v2\/categories?post=24020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}